"The new Comasina primary substation reaches 1.800 MW of power. This means that it alone would be able to handle the peak power of a medium-sized Lombardy city or serve approximately one hundred thousand people in the northwest area of Milan." This was stated by Renato Mazzoncini, CEO of A2a, at the inauguration of the new Comasina primary substation in Milan.
https://www.youtube.com/watch?v=uWBC1i539FA
